2021 BMW M3 COMPETITION
2021 BMW M3 COMPETITION (VIN WBS33AY05MFL21137). Photos, auction details and vehicle specs. Primary damage: Front End. Odometer: 22,415 mi Not Actual. Final bid: $22,800.
Vehicle overview
This page shows the available auction record for 2021 BMW M3 COMPETITION identified by VIN WBS33AY05MFL21137. Auction source: Copart • Sale date: Tue. Nov 18, 2025 04:00 PM GMT+1. Title status reported in the record: NJ - Cert Of Title-salvage. Reported damage: primary: Front End, secondary: Side. Recorded odometer entry: 22,415 mi Not Actual. Recorded final bid in history: $22,800. Photo set: 12 images (as provided by the listing source).
This 2021 BMW M3 COMPETITION was listed via Copart on Tue. Nov 18, 2025 04:00 PM GMT+1. Recorded final bid: $22,800.
Title status: NJ - Cert Of Title-salvage. Primary damage reported: Front End. Secondary damage: Side.
Odometer reading: 22,415 mi Not Actual.
Engine: 3.0L 6 Listen to engine. Transmission: Automatic. Fuel: Gas. Drive: Rear-wheel drive.
How to read this page
How to use this VIN page: review photos first, then compare the auction history and spec tables. Fields like damage, title, mileage, and sale date come from the underlying listing data and may be missing on some records.
If you are researching purchase, export, or rebuild decisions, treat this page as a research snapshot and validate everything with official paperwork, auction documents, and inspections. Wheelwise does not generate these attributes — we display what the source record contains.
Common reasons some values are blank: the original listing did not provide a field, the value was unreadable, or the record was imported without that attribute.

Photos and condition notes
The photo gallery contains 12 listing images for VIN WBS33AY05MFL21137. Use these photos to visually confirm body style, trim badges, wheels, interior options, and visible damage areas.
Damage fields are reported as categories (“primary” / “secondary”). They help you filter listings quickly, but they do not replace a detailed inspection.
When comparing this vehicle to similar listings, focus on year, drivetrain, mileage entry, title status, and auction date — these attributes most often explain price differences.
Another sales of this vehicle

Auction History
| Auction Name | Date | Final Bid |
|---|---|---|
| Copart | 2025-11-18 18:41:37 | $22,800 |
Vehicle Specs
| Auction | Copart |
|---|---|
| Auction date | Tue. Nov 18, 2025 04:00 PM GMT+1 |
| Final bid | $22,800 |
| Title | NJ - Cert Of Title-salvage |
|---|---|
| Primary damage | Front End |
| Secondary damage | Side |
| Key present | Yes |
| Start code | Run and Drive |
| Drive line | Rear-wheel drive |
|---|---|
| Engine | 3.0L 6 Listen to engine |
| Cylinders | 6 |
| Transmission | Automatic |
| Fuel type | Gas |
| VIN | WBS33AY05MFL21137 |
|---|---|
| Make | BMW |
| Model | M3 COMPETITION |
| Year | 2021 |
Key takeaways
- VIN: WBS33AY05MFL21137.
- Title status in this record: NJ - Cert Of Title-salvage.
- Auction: Copart • Date: Tue. Nov 18, 2025 04:00 PM GMT+1.
- Recorded final bid: $22,800.
- Primary damage: Front End.
- Secondary damage: Side.
- Odometer entry: 22,415 mi Not Actual.
- Powertrain: engine 3.0L 6 Listen to engine, transmission Automatic.
- Photos available: 12.
- Always confirm VIN, title, and condition with official documents before purchase or export.
FAQ
What does the final bid mean?
What does a salvage title mean?
Why does the odometer say “NOT ACTUAL”?
Where do the photos come from?
Can I use this page to verify the vehicle identity?
Quick Facts
- AuctionCopart
- Auction dateTue. Nov 18, 2025 04:00 PM GMT+1
- TitleNJ - Cert Of Title-salvage
- Primary damageFront End
- Secondary damageSide
- Odometer22,415 mi Not Actual
- Final bid$22,800
- TransmissionAutomatic
- FuelGas
- DriveRear-wheel drive
- Engine3.0L 6 Listen to engine
- Cylinders6
Vehicle Information
| Auction Date | Tue. Nov 18, 2025 04:00 PM GMT+1 |
|---|---|
| Auction Name | Copart |
| Selling Branch | N/A |
| Stock Number | N/A |
| Vehicle | 2021 BMW M3 COMPETITION |
| VIN | WBS33AY05MFL21137 |
| Title | NJ - Cert Of Title-salvage |
| Primary Damage | Front End |
| Secondary Damage | Side |
| Odometer | 22,415 mi Not Actual |
| Key Present | Yes |
| Start Code | Run and Drive |
| Drive Line Type | Rear-wheel drive |
| Cylinders | 6 |
| Engine | 3.0L 6 Listen to engine |
| Transmission | Automatic |
| Fuel Type | Gas |
| Restraint System | N/A |