2021 BMW M3 COMPETITION

VIN: WBS33AY06MFK91548 Auction: Copart Final Bid: $27,000

2021 BMW M3 COMPETITION (VIN WBS33AY06MFK91548). Photos, auction details and vehicle specs. Primary damage: Front End. Odometer: 87,168 mi Actual. Final bid: $27,000.

Vehicle overview

This page shows the available auction record for 2021 BMW M3 COMPETITION identified by VIN WBS33AY06MFK91548. Auction source: Copart • Sale date: Tue. Nov 11, 2025 04:00 PM GMT+1. Title status reported in the record: MD - Cert Of Salvage > 75% Damage. Reported damage: primary: Front End, secondary: Undercarriage. Recorded odometer entry: 87,168 mi Actual. Recorded final bid in history: $27,000. Photo set: 13 images (as provided by the listing source).

This 2021 BMW M3 COMPETITION was listed via Copart on Tue. Nov 11, 2025 04:00 PM GMT+1. Recorded final bid: $27,000.

Title status: MD - Cert Of Salvage > 75% Damage. Primary damage reported: Front End. Secondary damage: Undercarriage.

Odometer reading: 87,168 mi Actual.

Engine: 3.0L 6 Listen to engine. Transmission: Automatic. Fuel: Gas. Drive: Rear-wheel drive.

How to read this page

How to use this VIN page: review photos first, then compare the auction history and spec tables. Fields like damage, title, mileage, and sale date come from the underlying listing data and may be missing on some records.

If you are researching purchase, export, or rebuild decisions, treat this page as a research snapshot and validate everything with official paperwork, auction documents, and inspections. Wheelwise does not generate these attributes — we display what the source record contains.

Common reasons some values are blank: the original listing did not provide a field, the value was unreadable, or the record was imported without that attribute.

Photos and condition notes

The photo gallery contains 13 listing images for VIN WBS33AY06MFK91548. Use these photos to visually confirm body style, trim badges, wheels, interior options, and visible damage areas.

Damage fields are reported as categories (“primary” / “secondary”). They help you filter listings quickly, but they do not replace a detailed inspection.

When comparing this vehicle to similar listings, focus on year, drivetrain, mileage entry, title status, and auction date — these attributes most often explain price differences.

Another sales of this vehicle

Sale 1 of 2021 BMW M3 COMPETITION (VIN WBS33AY06MFK91548)
$27,000
Auction: Copart
Date: 2025-11-11 17:09:50
Lot: 67623355
Condition: MD - Cert Of Salvage > 75% Damage
Damage: Front End
Mileage: 87,168 mi Actual

Auction History

Auction NameDateFinal Bid
Copart2025-11-11 17:09:50$27,000

Vehicle Specs

Auction & Sale
AuctionCopart
Auction dateTue. Nov 11, 2025 04:00 PM GMT+1
Final bid$27,000
Title & Condition
TitleMD - Cert Of Salvage > 75% Damage
Primary damageFront End
Secondary damageUndercarriage
Key presentYes
Start codeEngine Starts
Powertrain
Drive lineRear-wheel drive
Engine3.0L 6 Listen to engine
Cylinders6
TransmissionAutomatic
Fuel typeGas
Identifiers
VINWBS33AY06MFK91548
MakeBMW
ModelM3 COMPETITION
Year2021

Key takeaways

  • VIN: WBS33AY06MFK91548.
  • Title status in this record: MD - Cert Of Salvage > 75% Damage.
  • Auction: Copart • Date: Tue. Nov 11, 2025 04:00 PM GMT+1.
  • Recorded final bid: $27,000.
  • Primary damage: Front End.
  • Secondary damage: Undercarriage.
  • Odometer entry: 87,168 mi Actual.
  • Powertrain: engine 3.0L 6 Listen to engine, transmission Automatic.
  • Photos available: 13.
  • Always confirm VIN, title, and condition with official documents before purchase or export.

FAQ

What does the final bid mean?
The final bid ($27,000) is the recorded winning bid shown in the auction history. It may not include fees, taxes, or transportation.
What does a salvage title mean?
“Salvage” usually indicates the vehicle was declared a total loss by an insurer or authority. Rules vary by state/country, so always verify local registration and inspection requirements.
Where do the photos come from?
Photos are the available listing images for this VIN/lot. They help you visually assess condition and damage, but they may not show every issue.
Can I use this page to verify the vehicle identity?
This page is a research snapshot. Always confirm VIN, title status, and condition with official documents and an in-person inspection when possible.

Quick Facts

  • AuctionCopart
  • Auction dateTue. Nov 11, 2025 04:00 PM GMT+1
  • TitleMD - Cert Of Salvage > 75% Damage
  • Primary damageFront End
  • Secondary damageUndercarriage
  • Odometer87,168 mi Actual
  • Final bid$27,000
  • TransmissionAutomatic
  • FuelGas
  • DriveRear-wheel drive
  • Engine3.0L 6 Listen to engine
  • Cylinders6

Vehicle Information

Auction DateTue. Nov 11, 2025 04:00 PM GMT+1
Auction NameCopart
Selling BranchN/A
Stock NumberN/A
Vehicle2021 BMW M3 COMPETITION
VINWBS33AY06MFK91548
TitleMD - Cert Of Salvage > 75% Damage
Primary DamageFront End
Secondary DamageUndercarriage
Odometer87,168 mi Actual
Key PresentYes
Start CodeEngine Starts
Drive Line TypeRear-wheel drive
Cylinders6
Engine3.0L 6 Listen to engine
TransmissionAutomatic
Fuel TypeGas
Restraint SystemN/A

Interested in This Car?

Contact us. We can help you find the right auction vehicle.

Contact Us