2024 BMW M3 COMPETITION

VIN: WBS43AY07RFS19785 Auction: Copart Final Bid: $46,250

2024 BMW M3 COMPETITION (VIN WBS43AY07RFS19785). Photos, auction details and vehicle specs. Primary damage: FRONT END. Odometer: 17,602 mi (ACTUAL). Final bid: $46,250.

Vehicle overview

This page shows the available auction record for 2024 BMW M3 COMPETITION identified by VIN WBS43AY07RFS19785. Auction source: Copart • Sale date: Mon. Sep 29, 2025. Title status reported in the record: IL - SALVAGE CERTIFICATE. Reported damage: primary: FRONT END. Recorded odometer entry: 17,602 mi (ACTUAL). Recorded final bid in history: $46,250. Photo set: 12 images (as provided by the listing source).

This 2024 BMW M3 COMPETITION was listed via Copart on Mon. Sep 29, 2025. Recorded final bid: $46,250.

Title status: IL - SALVAGE CERTIFICATE. Primary damage reported: FRONT END.

Odometer reading: 17,602 mi (ACTUAL).

Engine: 3.0L 6. Transmission: AUTOMATIC. Fuel: GAS. Drive: All wheel drive.

How to read this page

How to use this VIN page: review photos first, then compare the auction history and spec tables. Fields like damage, title, mileage, and sale date come from the underlying listing data and may be missing on some records.

If you are researching purchase, export, or rebuild decisions, treat this page as a research snapshot and validate everything with official paperwork, auction documents, and inspections. Wheelwise does not generate these attributes — we display what the source record contains.

Common reasons some values are blank: the original listing did not provide a field, the value was unreadable, or the record was imported without that attribute.

Photos and condition notes

The photo gallery contains 12 listing images for VIN WBS43AY07RFS19785. Use these photos to visually confirm body style, trim badges, wheels, interior options, and visible damage areas.

Damage fields are reported as categories (“primary” / “secondary”). They help you filter listings quickly, but they do not replace a detailed inspection.

When comparing this vehicle to similar listings, focus on year, drivetrain, mileage entry, title status, and auction date — these attributes most often explain price differences.

Another sales of this vehicle

Sale 1 of 2024 BMW M3 COMPETITION (VIN WBS43AY07RFS19785)
$46,250
Auction: Copart
Date: 2025-09-29 19:41:33
Lot: 63383255
Condition: IL - SALVAGE CERTIFICATE
Damage: FRONT END
Mileage: 17,602 mi (ACTUAL)

Auction History

Auction NameDateFinal Bid
Copart2025-09-29 19:41:33$46,250

Vehicle Specs

Auction & Sale
AuctionCopart
Auction dateMon. Sep 29, 2025
Final bid$46,250
Title & Condition
TitleIL - SALVAGE CERTIFICATE
Primary damageFRONT END
Key presentYES
Powertrain
Drive lineAll wheel drive
Engine3.0L 6
Cylinders6
TransmissionAUTOMATIC
Fuel typeGAS
Identifiers
VINWBS43AY07RFS19785
MakeBMW
ModelM3 COMPETITION
Year2024

Key takeaways

  • VIN: WBS43AY07RFS19785.
  • Title status in this record: IL - SALVAGE CERTIFICATE.
  • Auction: Copart • Date: Mon. Sep 29, 2025.
  • Recorded final bid: $46,250.
  • Primary damage: FRONT END.
  • Odometer entry: 17,602 mi (ACTUAL).
  • Powertrain: engine 3.0L 6, transmission AUTOMATIC.
  • Photos available: 12.
  • Always confirm VIN, title, and condition with official documents before purchase or export.

FAQ

What does the final bid mean?
The final bid ($46,250) is the recorded winning bid shown in the auction history. It may not include fees, taxes, or transportation.
What does a salvage title mean?
“Salvage” usually indicates the vehicle was declared a total loss by an insurer or authority. Rules vary by state/country, so always verify local registration and inspection requirements.
Where do the photos come from?
Photos are the available listing images for this VIN/lot. They help you visually assess condition and damage, but they may not show every issue.
Can I use this page to verify the vehicle identity?
This page is a research snapshot. Always confirm VIN, title status, and condition with official documents and an in-person inspection when possible.

Quick Facts

  • AuctionCopart
  • Auction dateMon. Sep 29, 2025
  • TitleIL - SALVAGE CERTIFICATE
  • Primary damageFRONT END
  • Odometer17,602 mi (ACTUAL)
  • Final bid$46,250
  • TransmissionAUTOMATIC
  • FuelGAS
  • DriveAll wheel drive
  • Engine3.0L 6
  • Cylinders6

Vehicle Information

Auction DateMon. Sep 29, 2025
Auction NameCopart
Selling BranchN/A
Stock NumberN/A
Vehicle2024 BMW M3 COMPETITION
VINWBS43AY07RFS19785
TitleIL - SALVAGE CERTIFICATE
Primary DamageFRONT END
Secondary DamageN/A
Odometer17,602 mi (ACTUAL)
Key PresentYES
Start CodeN/A
Drive Line TypeAll wheel drive
Cylinders6
Engine3.0L 6
TransmissionAUTOMATIC
Fuel TypeGAS
Restraint SystemN/A

Interested in This Car?

Contact us. We can help you find the right auction vehicle.

Contact Us