2025 BMW M3 COMPETITION

VIN: WBS33HJ06SFU45353 Auction: Copart Final Bid: $22,400

2025 BMW M3 COMPETITION (VIN WBS33HJ06SFU45353). Photos, auction details and vehicle specs. Primary damage: All Over. Odometer: 10,608 mi Actual. Final bid: $22,400.

Vehicle overview

This page shows the available auction record for 2025 BMW M3 COMPETITION identified by VIN WBS33HJ06SFU45353. Auction source: Copart • Sale date: Tue. Nov 18, 2025 09:00 PM GMT+1. Title status reported in the record: CA - Salvage Certificate. Reported damage: primary: All Over, secondary: Undercarriage. Recorded odometer entry: 10,608 mi Actual. Recorded final bid in history: $22,400. Photo set: 14 images (as provided by the listing source).

This 2025 BMW M3 COMPETITION was listed via Copart on Tue. Nov 18, 2025 09:00 PM GMT+1. Recorded final bid: $22,400.

Title status: CA - Salvage Certificate. Primary damage reported: All Over. Secondary damage: Undercarriage.

Odometer reading: 10,608 mi Actual.

Engine: 3.0L 6. Transmission: Automatic. Fuel: Gas. Drive: All wheel drive.

How to read this page

How to use this VIN page: review photos first, then compare the auction history and spec tables. Fields like damage, title, mileage, and sale date come from the underlying listing data and may be missing on some records.

If you are researching purchase, export, or rebuild decisions, treat this page as a research snapshot and validate everything with official paperwork, auction documents, and inspections. Wheelwise does not generate these attributes — we display what the source record contains.

Common reasons some values are blank: the original listing did not provide a field, the value was unreadable, or the record was imported without that attribute.

Photos and condition notes

The photo gallery contains 14 listing images for VIN WBS33HJ06SFU45353. Use these photos to visually confirm body style, trim badges, wheels, interior options, and visible damage areas.

Damage fields are reported as categories (“primary” / “secondary”). They help you filter listings quickly, but they do not replace a detailed inspection.

When comparing this vehicle to similar listings, focus on year, drivetrain, mileage entry, title status, and auction date — these attributes most often explain price differences.

Another sales of this vehicle

Sale 1 of 2025 BMW M3 COMPETITION (VIN WBS33HJ06SFU45353)
$22,400
Auction: Copart
Date: 2025-11-18 22:48:24
Lot: 69551775
Condition: CA - Salvage Certificate
Damage: All Over
Mileage: 10,608 mi Actual

Auction History

Auction NameDateFinal Bid
Copart2025-11-18 22:48:24$22,400

Vehicle Specs

Auction & Sale
AuctionCopart
Auction dateTue. Nov 18, 2025 09:00 PM GMT+1
Final bid$22,400
Title & Condition
TitleCA - Salvage Certificate
Primary damageAll Over
Secondary damageUndercarriage
Key presentYes
Start codeEngine Starts
Powertrain
Drive lineAll wheel drive
Engine3.0L 6
Cylinders6
TransmissionAutomatic
Fuel typeGas
Identifiers
VINWBS33HJ06SFU45353
MakeBMW
ModelM3 COMPETITION
Year2025

Key takeaways

  • VIN: WBS33HJ06SFU45353.
  • Title status in this record: CA - Salvage Certificate.
  • Auction: Copart • Date: Tue. Nov 18, 2025 09:00 PM GMT+1.
  • Recorded final bid: $22,400.
  • Primary damage: All Over.
  • Secondary damage: Undercarriage.
  • Odometer entry: 10,608 mi Actual.
  • Powertrain: engine 3.0L 6, transmission Automatic.
  • Photos available: 14.
  • Always confirm VIN, title, and condition with official documents before purchase or export.

FAQ

What does the final bid mean?
The final bid ($22,400) is the recorded winning bid shown in the auction history. It may not include fees, taxes, or transportation.
What does a salvage title mean?
“Salvage” usually indicates the vehicle was declared a total loss by an insurer or authority. Rules vary by state/country, so always verify local registration and inspection requirements.
Where do the photos come from?
Photos are the available listing images for this VIN/lot. They help you visually assess condition and damage, but they may not show every issue.
Can I use this page to verify the vehicle identity?
This page is a research snapshot. Always confirm VIN, title status, and condition with official documents and an in-person inspection when possible.

Quick Facts

  • AuctionCopart
  • Auction dateTue. Nov 18, 2025 09:00 PM GMT+1
  • TitleCA - Salvage Certificate
  • Primary damageAll Over
  • Secondary damageUndercarriage
  • Odometer10,608 mi Actual
  • Final bid$22,400
  • TransmissionAutomatic
  • FuelGas
  • DriveAll wheel drive
  • Engine3.0L 6
  • Cylinders6

Vehicle Information

Auction DateTue. Nov 18, 2025 09:00 PM GMT+1
Auction NameCopart
Selling BranchN/A
Stock NumberN/A
Vehicle2025 BMW M3 COMPETITION
VINWBS33HJ06SFU45353
TitleCA - Salvage Certificate
Primary DamageAll Over
Secondary DamageUndercarriage
Odometer10,608 mi Actual
Key PresentYes
Start CodeEngine Starts
Drive Line TypeAll wheel drive
Cylinders6
Engine3.0L 6
TransmissionAutomatic
Fuel TypeGas
Restraint SystemN/A

Interested in This Car?

Contact us. We can help you find the right auction vehicle.

Contact Us