2015 BMW M3
2015 BMW M3 (VIN WBS3C9C5XFP804413). Photos, auction details and vehicle specs. Primary damage: Minor Dent/scratches. Odometer: 112,693 mi Actual. Final bid: $8,700.
Vehicle overview
This page shows the available auction record for 2015 BMW M3 identified by VIN WBS3C9C5XFP804413. Auction source: Copart • Sale date: Thu. Nov 20, 2025 04:00 PM GMT+1. Title status reported in the record: FL - Certificate Of Title Title Absent. Reported damage: primary: Minor Dent/scratches, secondary: Normal Wear. Recorded odometer entry: 112,693 mi Actual. Recorded final bid in history: $8,700. Photo set: 10 images (as provided by the listing source).
This 2015 BMW M3 was listed via Copart on Thu. Nov 20, 2025 04:00 PM GMT+1. Recorded final bid: $8,700.
Title status: FL - Certificate Of Title Title Absent. Primary damage reported: Minor Dent/scratches. Secondary damage: Normal Wear.
Odometer reading: 112,693 mi Actual.
Engine: 3.0L 6. Transmission: Automatic. Fuel: Gas. Drive: Rear-wheel drive.
How to read this page
How to use this VIN page: review photos first, then compare the auction history and spec tables. Fields like damage, title, mileage, and sale date come from the underlying listing data and may be missing on some records.
If you are researching purchase, export, or rebuild decisions, treat this page as a research snapshot and validate everything with official paperwork, auction documents, and inspections. Wheelwise does not generate these attributes — we display what the source record contains.
Common reasons some values are blank: the original listing did not provide a field, the value was unreadable, or the record was imported without that attribute.

Photos and condition notes
The photo gallery contains 10 listing images for VIN WBS3C9C5XFP804413. Use these photos to visually confirm body style, trim badges, wheels, interior options, and visible damage areas.
Damage fields are reported as categories (“primary” / “secondary”). They help you filter listings quickly, but they do not replace a detailed inspection.
When comparing this vehicle to similar listings, focus on year, drivetrain, mileage entry, title status, and auction date — these attributes most often explain price differences.
Another sales of this vehicle

Auction History
| Auction Name | Date | Final Bid |
|---|---|---|
| Copart | 2025-11-18 17:24:30 | $8,700 |
Vehicle Specs
| Auction | Copart |
|---|---|
| Auction date | Thu. Nov 20, 2025 04:00 PM GMT+1 |
| Final bid | $8,700 |
| Title | FL - Certificate Of Title Title Absent |
|---|---|
| Primary damage | Minor Dent/scratches |
| Secondary damage | Normal Wear |
| Key present | Yes |
| Start code | Run and Drive |
| Drive line | Rear-wheel drive |
|---|---|
| Engine | 3.0L 6 |
| Cylinders | 6 |
| Transmission | Automatic |
| Fuel type | Gas |
| VIN | WBS3C9C5XFP804413 |
|---|---|
| Make | BMW |
| Model | M3 |
| Year | 2015 |
Key takeaways
- VIN: WBS3C9C5XFP804413.
- Title status in this record: FL - Certificate Of Title Title Absent.
- Auction: Copart • Date: Thu. Nov 20, 2025 04:00 PM GMT+1.
- Recorded final bid: $8,700.
- Primary damage: Minor Dent/scratches.
- Secondary damage: Normal Wear.
- Odometer entry: 112,693 mi Actual.
- Powertrain: engine 3.0L 6, transmission Automatic.
- Photos available: 10.
- Always confirm VIN, title, and condition with official documents before purchase or export.
FAQ
What does the final bid mean?
Where do the photos come from?
Can I use this page to verify the vehicle identity?
Quick Facts
- AuctionCopart
- Auction dateThu. Nov 20, 2025 04:00 PM GMT+1
- TitleFL - Certificate Of Title Title Absent
- Primary damageMinor Dent/scratches
- Secondary damageNormal Wear
- Odometer112,693 mi Actual
- Final bid$8,700
- TransmissionAutomatic
- FuelGas
- DriveRear-wheel drive
- Engine3.0L 6
- Cylinders6
Vehicle Information
| Auction Date | Thu. Nov 20, 2025 04:00 PM GMT+1 |
|---|---|
| Auction Name | Copart |
| Selling Branch | N/A |
| Stock Number | N/A |
| Vehicle | 2015 BMW M3 |
| VIN | WBS3C9C5XFP804413 |
| Title | FL - Certificate Of Title Title Absent |
| Primary Damage | Minor Dent/scratches |
| Secondary Damage | Normal Wear |
| Odometer | 112,693 mi Actual |
| Key Present | Yes |
| Start Code | Run and Drive |
| Drive Line Type | Rear-wheel drive |
| Cylinders | 6 |
| Engine | 3.0L 6 |
| Transmission | Automatic |
| Fuel Type | Gas |
| Restraint System | N/A |