2023 Bmw M3 COMPETITION
2023 Bmw M3 COMPETITION (VIN WBS33AY05PFP66899). Photos, auction details and vehicle specs. Primary damage: All Over. Odometer: 11,309 mi (Actual).
Vehicle overview
This page shows the available auction record for 2023 Bmw M3 COMPETITION identified by VIN WBS33AY05PFP66899. Auction source: IAAI • Sale date: Thu Jul 3, 8:30am (CDT). Title status reported in the record: CERTIFICATE OF DESTRUCTION (Florida). Reported damage: primary: All Over, secondary: Suspension. Recorded odometer entry: 11,309 mi (Actual). Photo set: 17 images (as provided by the listing source).
This 2023 Bmw M3 COMPETITION was listed via IAAI on Thu Jul 3, 8:30am (CDT).
Title status: CERTIFICATE OF DESTRUCTION (Florida). Primary damage reported: All Over. Secondary damage: Suspension.
Odometer reading: 11,309 mi (Actual).
Engine: 3.0L I-6 DI, DOHC, VVT, TURBO, 503HP. Transmission: Automatic Transmission. Fuel: Gasoline. Drive: Rear Wheel Drive.
How to read this page
How to use this VIN page: review photos first, then compare the auction history and spec tables. Fields like damage, title, mileage, and sale date come from the underlying listing data and may be missing on some records.
If you are researching purchase, export, or rebuild decisions, treat this page as a research snapshot and validate everything with official paperwork, auction documents, and inspections. Wheelwise does not generate these attributes — we display what the source record contains.
Common reasons some values are blank: the original listing did not provide a field, the value was unreadable, or the record was imported without that attribute.

Photos and condition notes
The photo gallery contains 17 listing images for VIN WBS33AY05PFP66899. Use these photos to visually confirm body style, trim badges, wheels, interior options, and visible damage areas.
Damage fields are reported as categories (“primary” / “secondary”). They help you filter listings quickly, but they do not replace a detailed inspection.
When comparing this vehicle to similar listings, focus on year, drivetrain, mileage entry, title status, and auction date — these attributes most often explain price differences.
Auction History
Vehicle Specs
| Auction | IAAI |
|---|---|
| Auction date | Thu Jul 3, 8:30am (CDT) |
| Title | CERTIFICATE OF DESTRUCTION (Florida) |
|---|---|
| Primary damage | All Over |
| Secondary damage | Suspension |
| Key present | Present |
| Start code | Stationary |
| Drive line | Rear Wheel Drive |
|---|---|
| Engine | 3.0L I-6 DI, DOHC, VVT, TURBO, 503HP |
| Cylinders | 6 Cylinders |
| Transmission | Automatic Transmission |
| Fuel type | Gasoline |
| VIN | WBS33AY05PFP66899 |
|---|---|
| Make | Bmw |
| Model | M3 |
| Year | 2023 |
| Trim / Package | COMPETITION |
Key takeaways
- VIN: WBS33AY05PFP66899.
- Title status in this record: CERTIFICATE OF DESTRUCTION (Florida).
- Auction: IAAI • Date: Thu Jul 3, 8:30am (CDT).
- Primary damage: All Over.
- Secondary damage: Suspension.
- Odometer entry: 11,309 mi (Actual).
- Powertrain: engine 3.0L I-6 DI, DOHC, VVT, TURBO, 503HP, transmission Automatic Transmission.
- Photos available: 17.
- Always confirm VIN, title, and condition with official documents before purchase or export.
FAQ
What does the final bid mean?
Where do the photos come from?
Can I use this page to verify the vehicle identity?
Quick Facts
- AuctionIAAI
- Auction dateThu Jul 3, 8:30am (CDT)
- TitleCERTIFICATE OF DESTRUCTION (Florida)
- Primary damageAll Over
- Secondary damageSuspension
- Odometer11,309 mi (Actual)
- TransmissionAutomatic Transmission
- FuelGasoline
- DriveRear Wheel Drive
- Engine3.0L I-6 DI, DOHC, VVT, TURBO, 503HP
- Cylinders6 Cylinders
Vehicle Information
| Auction Date | Thu Jul 3, 8:30am (CDT) |
|---|---|
| Auction Name | IAAI |
| Selling Branch | N/A |
| Stock Number | N/A |
| Vehicle | 2023 Bmw M3 COMPETITION |
| VIN | WBS33AY05PFP66899 |
| Title | CERTIFICATE OF DESTRUCTION (Florida) |
| Primary Damage | All Over |
| Secondary Damage | Suspension |
| Odometer | 11,309 mi (Actual) |
| Key Present | Present |
| Start Code | Stationary |
| Drive Line Type | Rear Wheel Drive |
| Cylinders | 6 Cylinders |
| Engine | 3.0L I-6 DI, DOHC, VVT, TURBO, 503HP |
| Transmission | Automatic Transmission |
| Fuel Type | Gasoline |
| Restraint System | Front impact airbag driver;Front side impact airbag driver;Overhead airbags;Front impact airbag passenger;Front side impact airbag passenger;Knee airbag |