2025 BMW M3

VIN: WBS13HJ06SFU38474 Auction: Copart Final Bid: $37,000

2025 BMW M3 (VIN WBS13HJ06SFU38474). Photos, auction details and vehicle specs. Primary damage: Front End. Odometer: 0 mi Not Actual. Final bid: $37,000.

Vehicle overview

This page shows the available auction record for 2025 BMW M3 identified by VIN WBS13HJ06SFU38474. Auction source: Copart • Sale date: Tue. Dec 23, 2025 04:00 PM GMT+1. Title status reported in the record: MD - Cert Of Salvage < 75% Damage. Reported damage: primary: Front End. Recorded odometer entry: 0 mi Not Actual. Recorded final bid in history: $37,000. Photo set: 12 images (as provided by the listing source).

This 2025 BMW M3 was listed via Copart on Tue. Dec 23, 2025 04:00 PM GMT+1. Recorded final bid: $37,000.

Title status: MD - Cert Of Salvage < 75% Damage. Primary damage reported: Front End.

Odometer reading: 0 mi Not Actual.

Engine: 3.0L 6. Transmission: Manual. Fuel: Gas. Drive: Rear-wheel drive.

How to read this page

How to use this VIN page: review photos first, then compare the auction history and spec tables. Fields like damage, title, mileage, and sale date come from the underlying listing data and may be missing on some records.

If you are researching purchase, export, or rebuild decisions, treat this page as a research snapshot and validate everything with official paperwork, auction documents, and inspections. Wheelwise does not generate these attributes — we display what the source record contains.

Common reasons some values are blank: the original listing did not provide a field, the value was unreadable, or the record was imported without that attribute.

Photos and condition notes

The photo gallery contains 12 listing images for VIN WBS13HJ06SFU38474. Use these photos to visually confirm body style, trim badges, wheels, interior options, and visible damage areas.

Damage fields are reported as categories (“primary” / “secondary”). They help you filter listings quickly, but they do not replace a detailed inspection.

When comparing this vehicle to similar listings, focus on year, drivetrain, mileage entry, title status, and auction date — these attributes most often explain price differences.

Another sales of this vehicle

Sale 1 of 2025 BMW M3 (VIN WBS13HJ06SFU38474)
$37,000
Auction: Copart
Date: 2025-12-23 17:27:07
Lot: 85344215
Condition: MD - Cert Of Salvage < 75% Damage
Damage: Front End
Mileage: 0 mi Not Actual

Auction History

Auction NameDateFinal Bid
Copart2025-12-23 17:27:07$37,000

Vehicle Specs

Auction & Sale
AuctionCopart
Auction dateTue. Dec 23, 2025 04:00 PM GMT+1
Final bid$37,000
Title & Condition
TitleMD - Cert Of Salvage < 75% Damage
Primary damageFront End
Key presentYes
Powertrain
Drive lineRear-wheel drive
Engine3.0L 6
Cylinders6
TransmissionManual
Fuel typeGas
Identifiers
VINWBS13HJ06SFU38474
MakeBMW
ModelM3
Year2025

Key takeaways

  • VIN: WBS13HJ06SFU38474.
  • Title status in this record: MD - Cert Of Salvage < 75% Damage.
  • Auction: Copart • Date: Tue. Dec 23, 2025 04:00 PM GMT+1.
  • Recorded final bid: $37,000.
  • Primary damage: Front End.
  • Odometer entry: 0 mi Not Actual.
  • Powertrain: engine 3.0L 6, transmission Manual.
  • Photos available: 12.
  • Always confirm VIN, title, and condition with official documents before purchase or export.

FAQ

What does the final bid mean?
The final bid ($37,000) is the recorded winning bid shown in the auction history. It may not include fees, taxes, or transportation.
What does a salvage title mean?
“Salvage” usually indicates the vehicle was declared a total loss by an insurer or authority. Rules vary by state/country, so always verify local registration and inspection requirements.
Why does the odometer say “NOT ACTUAL”?
This label typically means the mileage reading may be inaccurate or unverifiable. Treat the mileage as unknown unless you can confirm it from reliable documentation.
Where do the photos come from?
Photos are the available listing images for this VIN/lot. They help you visually assess condition and damage, but they may not show every issue.
Can I use this page to verify the vehicle identity?
This page is a research snapshot. Always confirm VIN, title status, and condition with official documents and an in-person inspection when possible.

Quick Facts

  • AuctionCopart
  • Auction dateTue. Dec 23, 2025 04:00 PM GMT+1
  • TitleMD - Cert Of Salvage < 75% Damage
  • Primary damageFront End
  • Odometer0 mi Not Actual
  • Final bid$37,000
  • TransmissionManual
  • FuelGas
  • DriveRear-wheel drive
  • Engine3.0L 6
  • Cylinders6

Vehicle Information

Auction DateTue. Dec 23, 2025 04:00 PM GMT+1
Auction NameCopart
Selling BranchN/A
Stock NumberN/A
Vehicle2025 BMW M3
VINWBS13HJ06SFU38474
TitleMD - Cert Of Salvage < 75% Damage
Primary DamageFront End
Secondary DamageN/A
Odometer0 mi Not Actual
Key PresentYes
Start CodeN/A
Drive Line TypeRear-wheel drive
Cylinders6
Engine3.0L 6
TransmissionManual
Fuel TypeGas
Restraint SystemN/A

Interested in This Car?

Contact us. We can help you find the right auction vehicle.

Contact Us