2024 BMW M4 COMPETITION
2024 BMW M4 COMPETITION (VIN WBS33AZ05RCP74908). Photos, auction details and vehicle specs. Primary damage: SIDE. Odometer: 25,303 mi (ACTUAL). Final bid: $43,250.
Vehicle overview
This page shows the available auction record for 2024 BMW M4 COMPETITION identified by VIN WBS33AZ05RCP74908. Auction source: Copart • Sale date: Mon. Oct 13, 2025. Title status reported in the record: FL - CERT OF TITLE SLVG REBUILDABLE. Reported damage: primary: SIDE, secondary: UNDERCARRIAGE. Recorded odometer entry: 25,303 mi (ACTUAL). Recorded final bid in history: $43,250. Photo set: 12 images (as provided by the listing source).
This 2024 BMW M4 COMPETITION was listed via Copart on Mon. Oct 13, 2025. Recorded final bid: $43,250.
Title status: FL - CERT OF TITLE SLVG REBUILDABLE. Primary damage reported: SIDE. Secondary damage: UNDERCARRIAGE.
Odometer reading: 25,303 mi (ACTUAL).
Engine: 3.0L 6. Transmission: AUTOMATIC. Fuel: GAS. Drive: Rear-wheel drive.
How to read this page
How to use this VIN page: review photos first, then compare the auction history and spec tables. Fields like damage, title, mileage, and sale date come from the underlying listing data and may be missing on some records.
If you are researching purchase, export, or rebuild decisions, treat this page as a research snapshot and validate everything with official paperwork, auction documents, and inspections. Wheelwise does not generate these attributes — we display what the source record contains.
Common reasons some values are blank: the original listing did not provide a field, the value was unreadable, or the record was imported without that attribute.

Photos and condition notes
The photo gallery contains 12 listing images for VIN WBS33AZ05RCP74908. Use these photos to visually confirm body style, trim badges, wheels, interior options, and visible damage areas.
Damage fields are reported as categories (“primary” / “secondary”). They help you filter listings quickly, but they do not replace a detailed inspection.
When comparing this vehicle to similar listings, focus on year, drivetrain, mileage entry, title status, and auction date — these attributes most often explain price differences.
Another sales of this vehicle

Auction History
| Auction Name | Date | Final Bid |
|---|---|---|
| Copart | 2025-10-13 16:17:39 | $43,250 |
Vehicle Specs
| Auction | Copart |
|---|---|
| Auction date | Mon. Oct 13, 2025 |
| Final bid | $43,250 |
| Title | FL - CERT OF TITLE SLVG REBUILDABLE |
|---|---|
| Primary damage | SIDE |
| Secondary damage | UNDERCARRIAGE |
| Key present | YES |
| Drive line | Rear-wheel drive |
|---|---|
| Engine | 3.0L 6 |
| Cylinders | 6 |
| Transmission | AUTOMATIC |
| Fuel type | GAS |
| VIN | WBS33AZ05RCP74908 |
|---|---|
| Make | BMW |
| Model | M4 COMPETITION |
| Year | 2024 |
Key takeaways
- VIN: WBS33AZ05RCP74908.
- Title status in this record: FL - CERT OF TITLE SLVG REBUILDABLE.
- Auction: Copart • Date: Mon. Oct 13, 2025.
- Recorded final bid: $43,250.
- Primary damage: SIDE.
- Secondary damage: UNDERCARRIAGE.
- Odometer entry: 25,303 mi (ACTUAL).
- Powertrain: engine 3.0L 6, transmission AUTOMATIC.
- Photos available: 12.
- Always confirm VIN, title, and condition with official documents before purchase or export.
FAQ
What does the final bid mean?
Where do the photos come from?
Can I use this page to verify the vehicle identity?
Quick Facts
- AuctionCopart
- Auction dateMon. Oct 13, 2025
- TitleFL - CERT OF TITLE SLVG REBUILDABLE
- Primary damageSIDE
- Secondary damageUNDERCARRIAGE
- Odometer25,303 mi (ACTUAL)
- Final bid$43,250
- TransmissionAUTOMATIC
- FuelGAS
- DriveRear-wheel drive
- Engine3.0L 6
- Cylinders6
Vehicle Information
| Auction Date | Mon. Oct 13, 2025 |
|---|---|
| Auction Name | Copart |
| Selling Branch | N/A |
| Stock Number | N/A |
| Vehicle | 2024 BMW M4 COMPETITION |
| VIN | WBS33AZ05RCP74908 |
| Title | FL - CERT OF TITLE SLVG REBUILDABLE |
| Primary Damage | SIDE |
| Secondary Damage | UNDERCARRIAGE |
| Odometer | 25,303 mi (ACTUAL) |
| Key Present | YES |
| Start Code | N/A |
| Drive Line Type | Rear-wheel drive |
| Cylinders | 6 |
| Engine | 3.0L 6 |
| Transmission | AUTOMATIC |
| Fuel Type | GAS |
| Restraint System | N/A |