2022 Bmw M4 COMPETITION XDRIVE

VIN: WBS43AZ02NCK30252 Auction: IAAI Final Bid: Buy Now: $31,250

2022 Bmw M4 COMPETITION XDRIVE (VIN WBS43AZ02NCK30252). Photos, auction details and vehicle specs. Primary damage: Front End. Odometer: 44,704 mi (Actual). Final bid: Buy Now: $31,250.

Vehicle overview

This page shows the available auction record for 2022 Bmw M4 COMPETITION XDRIVE identified by VIN WBS43AZ02NCK30252. Auction source: IAAI • Sale date: Tue May 27, 8:30am (CDT). Title status reported in the record: SALVAGE (Idaho). Reported damage: primary: Front End. Recorded odometer entry: 44,704 mi (Actual). Recorded final bid in history: Buy Now: $31,250. Photo set: 19 images (as provided by the listing source).

This 2022 Bmw M4 COMPETITION XDRIVE was listed via IAAI on Tue May 27, 8:30am (CDT). Recorded final bid: Buy Now: $31,250.

Title status: SALVAGE (Idaho). Primary damage reported: Front End.

Odometer reading: 44,704 mi (Actual).

Engine: 3.0L I-6 DI, DOHC, VVT, TURBO, 503HP. Transmission: Automatic Transmission. Fuel: Gasoline. Drive: All Wheel Drive.

How to read this page

How to use this VIN page: review photos first, then compare the auction history and spec tables. Fields like damage, title, mileage, and sale date come from the underlying listing data and may be missing on some records.

If you are researching purchase, export, or rebuild decisions, treat this page as a research snapshot and validate everything with official paperwork, auction documents, and inspections. Wheelwise does not generate these attributes — we display what the source record contains.

Common reasons some values are blank: the original listing did not provide a field, the value was unreadable, or the record was imported without that attribute.

Photos and condition notes

The photo gallery contains 19 listing images for VIN WBS43AZ02NCK30252. Use these photos to visually confirm body style, trim badges, wheels, interior options, and visible damage areas.

Damage fields are reported as categories (“primary” / “secondary”). They help you filter listings quickly, but they do not replace a detailed inspection.

When comparing this vehicle to similar listings, focus on year, drivetrain, mileage entry, title status, and auction date — these attributes most often explain price differences.

Another sales of this vehicle

Sale 1 of 2022 Bmw M4 COMPETITION XDRIVE (VIN WBS43AZ02NCK30252)
Buy Now: $31,250
Auction: IAAI
Date: Tue May 27, 8:30am (CDT)
Lot: 41782686
Condition: SALVAGE (Idaho)
Damage: Front End
Mileage: 44,704 mi (Actual)
Sale 2 of 2022 Bmw M4 COMPETITION XDRIVE (VIN WBS43AZ02NCK30252)
If Bid for $27,600
Auction: IAAI
Date: 2025-05-27
Lot: 41782686
Condition: SALVAGE (Idaho)
Damage: Front End
Mileage: 44,704 mi (Actual)

Auction History

Auction NameDateFinal Bid
IAAITue May 27, 8:30am (CDT)Buy Now: $31,250
IAAI2025-05-27If Bid for $27,600

Vehicle Specs

Auction & Sale
AuctionIAAI
Auction dateTue May 27, 8:30am (CDT)
Final bidBuy Now: $31,250
Title & Condition
TitleSALVAGE (Idaho)
Primary damageFront End
Key presentPresent
Start codeRun & Drive
Powertrain
Drive lineAll Wheel Drive
Engine3.0L I-6 DI, DOHC, VVT, TURBO, 503HP
Cylinders6 Cylinders
TransmissionAutomatic Transmission
Fuel typeGasoline
Identifiers
VINWBS43AZ02NCK30252
MakeBmw
ModelM4
Year2022
Trim / PackageCOMPETITION XDRIVE

Key takeaways

  • VIN: WBS43AZ02NCK30252.
  • Title status in this record: SALVAGE (Idaho).
  • Auction: IAAI • Date: Tue May 27, 8:30am (CDT).
  • Recorded final bid: Buy Now: $31,250.
  • Primary damage: Front End.
  • Odometer entry: 44,704 mi (Actual).
  • Powertrain: engine 3.0L I-6 DI, DOHC, VVT, TURBO, 503HP, transmission Automatic Transmission.
  • Photos available: 19.
  • Always confirm VIN, title, and condition with official documents before purchase or export.

FAQ

What does the final bid mean?
The final bid (Buy Now: $31,250) is the recorded winning bid shown in the auction history. It may not include fees, taxes, or transportation.
What does a salvage title mean?
“Salvage” usually indicates the vehicle was declared a total loss by an insurer or authority. Rules vary by state/country, so always verify local registration and inspection requirements.
Where do the photos come from?
Photos are the available listing images for this VIN/lot. They help you visually assess condition and damage, but they may not show every issue.
Can I use this page to verify the vehicle identity?
This page is a research snapshot. Always confirm VIN, title status, and condition with official documents and an in-person inspection when possible.

Quick Facts

  • AuctionIAAI
  • Auction dateTue May 27, 8:30am (CDT)
  • TitleSALVAGE (Idaho)
  • Primary damageFront End
  • Odometer44,704 mi (Actual)
  • Final bidBuy Now: $31,250
  • TransmissionAutomatic Transmission
  • FuelGasoline
  • DriveAll Wheel Drive
  • Engine3.0L I-6 DI, DOHC, VVT, TURBO, 503HP
  • Cylinders6 Cylinders

Vehicle Information

Auction DateTue May 27, 8:30am (CDT)
Auction NameIAAI
Selling BranchN/A
Stock NumberN/A
Vehicle2022 Bmw M4 COMPETITION XDRIVE
VINWBS43AZ02NCK30252
TitleSALVAGE (Idaho)
Primary DamageFront End
Secondary DamageN/A
Odometer44,704 mi (Actual)
Key PresentPresent
Start CodeRun & Drive
Drive Line TypeAll Wheel Drive
Cylinders6 Cylinders
Engine3.0L I-6 DI, DOHC, VVT, TURBO, 503HP
TransmissionAutomatic Transmission
Fuel TypeGasoline
Restraint SystemFront impact airbag driver;Front side impact airbag driver;Overhead airbags;Front impact airbag passenger;Front side impact airbag passenger;Knee airbag

Interested in This Car?

Contact us. We can help you find the right auction vehicle.

Contact Us