2025 Bmw M4

VIN: WBS13HK06SCT44871 Auction: IAAI

2025 Bmw M4 (VIN WBS13HK06SCT44871). Photos, auction details and vehicle specs. Primary damage: Front & Rear. Odometer: 3,534 mi (Actual).

Vehicle overview

This page shows the available auction record for 2025 Bmw M4 identified by VIN WBS13HK06SCT44871. Auction source: IAAI • Sale date: Thu May 29, 8:30am (CDT). Title status reported in the record: CLEAR (Georgia). Reported damage: primary: Front & Rear, secondary: Right Side. Recorded odometer entry: 3,534 mi (Actual). Photo set: 18 images (as provided by the listing source).

This 2025 Bmw M4 was listed via IAAI on Thu May 29, 8:30am (CDT).

Title status: CLEAR (Georgia). Primary damage reported: Front & Rear. Secondary damage: Right Side.

Odometer reading: 3,534 mi (Actual).

Engine: 3.0L I-6 DI, DOHC, VVT, TURBO, 473HP. Transmission: Manual Transmission. Fuel: Gasoline. Drive: Rear Wheel Drive.

How to read this page

How to use this VIN page: review photos first, then compare the auction history and spec tables. Fields like damage, title, mileage, and sale date come from the underlying listing data and may be missing on some records.

If you are researching purchase, export, or rebuild decisions, treat this page as a research snapshot and validate everything with official paperwork, auction documents, and inspections. Wheelwise does not generate these attributes — we display what the source record contains.

Common reasons some values are blank: the original listing did not provide a field, the value was unreadable, or the record was imported without that attribute.

Photos and condition notes

The photo gallery contains 18 listing images for VIN WBS13HK06SCT44871. Use these photos to visually confirm body style, trim badges, wheels, interior options, and visible damage areas.

Damage fields are reported as categories (“primary” / “secondary”). They help you filter listings quickly, but they do not replace a detailed inspection.

When comparing this vehicle to similar listings, focus on year, drivetrain, mileage entry, title status, and auction date — these attributes most often explain price differences.

Auction History

No auction history.

Vehicle Specs

Auction & Sale
AuctionIAAI
Auction dateThu May 29, 8:30am (CDT)
Title & Condition
TitleCLEAR (Georgia)
Primary damageFront & Rear
Secondary damageRight Side
Key presentPresent
Start codeRun & Drive
Powertrain
Drive lineRear Wheel Drive
Engine3.0L I-6 DI, DOHC, VVT, TURBO, 473HP
Cylinders6 Cylinders
TransmissionManual Transmission
Fuel typeGasoline
Identifiers
VINWBS13HK06SCT44871
MakeBmw
ModelM4
Year2025

Key takeaways

  • VIN: WBS13HK06SCT44871.
  • Title status in this record: CLEAR (Georgia).
  • Auction: IAAI • Date: Thu May 29, 8:30am (CDT).
  • Primary damage: Front & Rear.
  • Secondary damage: Right Side.
  • Odometer entry: 3,534 mi (Actual).
  • Powertrain: engine 3.0L I-6 DI, DOHC, VVT, TURBO, 473HP, transmission Manual Transmission.
  • Photos available: 18.
  • Always confirm VIN, title, and condition with official documents before purchase or export.

FAQ

What does the final bid mean?
Final bid is the recorded winning bid shown in the auction history. It may not include fees, taxes, or transportation.
Where do the photos come from?
Photos are the available listing images for this VIN/lot. They help you visually assess condition and damage, but they may not show every issue.
Can I use this page to verify the vehicle identity?
This page is a research snapshot. Always confirm VIN, title status, and condition with official documents and an in-person inspection when possible.

Quick Facts

  • AuctionIAAI
  • Auction dateThu May 29, 8:30am (CDT)
  • TitleCLEAR (Georgia)
  • Primary damageFront & Rear
  • Secondary damageRight Side
  • Odometer3,534 mi (Actual)
  • TransmissionManual Transmission
  • FuelGasoline
  • DriveRear Wheel Drive
  • Engine3.0L I-6 DI, DOHC, VVT, TURBO, 473HP
  • Cylinders6 Cylinders

Vehicle Information

Auction DateThu May 29, 8:30am (CDT)
Auction NameIAAI
Selling BranchN/A
Stock NumberN/A
Vehicle2025 Bmw M4
VINWBS13HK06SCT44871
TitleCLEAR (Georgia)
Primary DamageFront & Rear
Secondary DamageRight Side
Odometer3,534 mi (Actual)
Key PresentPresent
Start CodeRun & Drive
Drive Line TypeRear Wheel Drive
Cylinders6 Cylinders
Engine3.0L I-6 DI, DOHC, VVT, TURBO, 473HP
TransmissionManual Transmission
Fuel TypeGasoline
Restraint SystemFront impact airbag driver;Front side impact airbag driver;Overhead airbags;Front impact airbag passenger;Front side impact airbag passenger;Knee airbag

Interested in This Car?

Contact us. We can help you find the right auction vehicle.

Contact Us